• 官方微信

2015 Event Review of Lead and Zinc Industry

Date:2016-03-18 10:20:00    From:JL GROUP
【Font:big middle small
Ministry of Finance decided to defer the lead-acid battery consumption tax levy 4%
January 27, 2015, the Ministry of Finance, State Administration of Taxation issued "on the batteries, paint consumption tax notice" notice said that since February 1, 2015, on batteries, paint consumption tax on the battery, but lithium and fuel power battery are exempted from consumption tax. Notice also made it clear, before December 31, 2015 for lead-acid battery consumption tax deferment; the rate of lead-acid batteries 4% consumption tax since January 1, 2016.
 
14 companies short-listed to the third list of lead-acid battery
 
February 4, 2015, according to "lead-acid battery industry access", "access Announcement Interim Measures lead-acid battery industry", upon application, the provincial industry and information technology departments of first instance, expert review, Industry and Information Technology Ministry of Environmental Protection for review and online publicity and other procedures, now 14, "in line with list of enterprises to be announced.
Ministry of Information Industry and the Ministry of Environmental Protection in accordance with "lead-acid battery industry access", "access Announcement Interim Measures lead-acid battery industry", upon application, the provincial industry and information technology departments of first instance, expert review of Industry and Information Ministry of Environmental Protection for review and online publicity and other procedures, issued a "consistent list of companies (third)."
 
The new standard of the Zinc Mine has a substantial increase
March 2015, "lead and zinc industry standard conditions (2015)" has been officially released, a substantial increase in new lead and zinc mine standards. The industry believes that issuance conditions conducive to industry to speed up integration. According to the specification condition, new small scale of not less than monomer and Zinc Mine ore 100,000 tons / year (300 tons / day), length of service shall be at least 10 years, medium-scale mining ore monomer should be more than 300,000 tons / year ( 1000 tons / day). Flotation process its ore processing capacity of mining enterprises should be not less than mining capacity.
 
Eurasian Economic Commission perform import temporary zero tariff for scrap precious metals and lead
 
April 22, 2015, the Eurasian Economic Commission at the press conference said it would scrap of precious metals and lead ore port temporary zero tariffs. The implementation of zero tariff from May 25 2015 to May 24, 2017. Minister of Trade of the Eurasian Economic Commission said lead ore and lead concentrate production of refined lead raw materials. The current cost of raw materials is generally higher than the cost of the final product, the implementation of zero tariff helps reduce cost and improve production yields. He said that currently lead concentrate mainly by the enterprises of Kazakhstan, Russia and Tajikistan of production, but it can not meet the needs of the market. Most lead concentrate production in South America, Guatemala, Peru and Mexico.